Allegro, ma non troppo

Real progress, one practice session at a time.

Go Practice Music is your personal practice coach — built by music professionals to help you build consistent habits and achieve lasting musical growth.

Free to download · iPhone, iPad & Android

Scan with your iPhone to get the app
Go Practice Music home screen with repertoire and streak

Everything in the app

Con moto — see it in action

Watch the app at work

Five short guided tours, narrated in English — from your first practice session to the weekly leagues.

App tour
Practice & recording
Note reading
Rhythm trainer
Progress & leagues

‹ swipe to explore ›

AAndante — where it all begins

Your practice, one home screen

Everything a session needs, one screen away: the pieces you are working on with their accumulated hours, today's goal against your target, and your daily streak burning at the top. Timer, metronome, tips and recorder are each a single tap away.

  • Repertoire cards with composer artwork and practice time
  • Daily goal and streak, front and center
  • One-tap access to every practice tool

Friction is the enemy of daily practice. When your pieces, goal and tools are all one tap away, starting a session takes seconds instead of minutes — and the streak counter quietly turns those sessions into a habit you don't want to break.

Practice home with repertoire, streak and quick actions
BTempo giusto — every minute counts

Stopwatch and timer, tied to your pieces

Time your sessions the way you prefer: an open-ended stopwatch or a set countdown. Both stay linked to the piece you are practicing, so every minute lands in the right history — with metronome and recording controls on the same screen.

  • Stopwatch and countdown modes
  • Automatic time logging per piece
  • Metronome and recorder within reach

What gets measured gets done. Timing every session makes your effort visible and honest, and because the minutes are logged to the exact piece you played, you can see at a glance whether your repertoire is getting balanced attention.

Stopwatch linked to a practice piece
Practice timer counting down
CGrazioso — a coach in your pocket

Daily guidance from professionals

Each day the app delivers a concise, professionally written practice tip — on dynamics, posture, rhythm or mindset. Small, well-timed corrections keep your practice intelligent, not merely long.

  • A new expert tip every day
  • Written by professionals in the field
  • Fundamentals-first advice for every level

Practicing badly cements mistakes; practicing well compounds. A single expert idea a day — on dynamics, posture or phrasing — steadily raises the quality of your sessions, which matters far more than their length.

Tip of the day
DL'istesso tempo — keep perfect time

A precision metronome

A full-width tap-tempo dial, exact BPM control and clean, reliable sound. Tap the wheel to find your tempo, fine-tune with plus and minus, and play — it is always one tap from your practice screen.

  • Tap tempo on a large rotary dial
  • Precise BPM control from largo to presto
  • Clear visual range from min to max

A steady inner pulse is the foundation every other skill stands on. Slow, metronome-guided repetition is how professionals build accuracy before speed — and tap tempo lets you match any score marking in seconds.

Metronome with tap tempo dial at 120 BPM
EEspressivo — your repertoire

Create pieces, keep the history

Register the works you are studying — composer, title and portrait artwork included — and every practice minute is attributed to the right piece. Even pieces you have set aside remain in your practice history, preserved with their accumulated hours.

  • Custom pieces with composer portraits
  • Automatic time attribution per piece
  • A permanent, browsable practice history

Naming what you're working on turns vague "playing around" into deliberate practice with goals. The per-piece hours reveal which works are being neglected, and the preserved history shows how far you've come — powerful fuel on hard days.

Practice history with accumulated time per piece
Create a custom piece with composer artwork
FRubato — record, then polish

A recorder and a studio in your pocket

Capture your playing in one tap and build a searchable, dated library of takes. Then refine them with professional processing: reverb presets from Room to Plate with precise amount control, and waveform trimming with draggable handles.

  • One-tap recording with a searchable library
  • Reverb presets with adjustable depth
  • Non-destructive trimming on an interactive waveform

Recording yourself is the fastest feedback loop in music: the microphone hears what you can't while playing. Regular listening back trains critical judgment, and a polished, trimmed take is something you can proudly share with a teacher or friends.

Recordings library
Audio enhancement with reverb and waveform trim

Ready to practice smarter?

Join musicians building real habits with Go Practice Music — free to download.

And it's just as at home on the big screen — fully supported on iPad.

Go Practice Music running on iPad
GCon moto — the full picture

Your progress dashboard

One screen sums up your journey: total points, daily streak with freeze protection, and lifetime practice hours measured against the 5,000-hour benchmark often associated with semi-professional playing. The Awards Hall is one tap below.

  • Daily streak and freeze-streak protection
  • Lifetime hours against a meaningful benchmark
  • Direct access to badges and trophies

Improvement in music is slow enough to be invisible day to day — which is why so many people quit. Seeing your lifetime hours grow against a real benchmark makes progress tangible, and the freeze streak protects your momentum when life interferes.

Progress dashboard with streak, total time and Awards Hall
Weekly practice statistics with daily bars and goal line
GCon brio — your week at a glance

This week, measured against your goal

A second statistics page turns your week into a clear picture: daily practice bars set against your personal goal line, so you can see at a glance which days you hit and which slipped.

The same page switches to Month and Year for the longer view, and you can step back through previous weeks to see how your consistency has changed over time. Each bar is colour-coded by activity — practice, note reading and rhythm — so you can see exactly where your time went.

HCon brio — the Awards Hall

31 badges and 17 trophies

The Awards Hall documents your musical development through collectible badges spanning consistency, milestones and mastery — plus a trophy cabinet running from starter awards to distinctions reserved for the truly dedicated. Locked trophies name themselves but keep their conditions: an invitation to find out.

  • Multi-level badges that advance with you
  • Locked trophies that signal the next challenge
  • Collection mastery meters for both

Long-term goals need short-term rewards. Badges and trophies celebrate the milestones along the way — your first exercise, ten minutes, a perfect week — carrying your motivation across the plateaus every musician inevitably hits.

Awards Hall with collectible badges
Trophy collection with locked trophies
JVivace — friendly rivalry

Weekly leagues with real stakes

Each week you are placed in a league of comparable players, where every session converts into points on a live table. A running countdown keeps the week's stakes visible, and Double Tempo boosts add a tactical dimension to the final days.

  • Weekly league placement with live standings
  • Practice points earned from every session
  • Strategic Double Tempo score boosts

A little friendly pressure works wonders on consistency. Knowing your league resets weekly gives every Monday a fresh start, and turning practice minutes into points makes the invisible work of musicianship feel immediate and rewarded.

Weekly league board with rankings and points
KFortissimo — your place among players

Player profiles and the leaderboards

Every musician has a public profile — rank, points, league level and earned badges — and two Leadership Boards crown the community's best on a podium — an all-time ranking and a monthly race that resets each month. Consistency, not sprints, is what climbs them.

  • Profiles with rank, points and badge showcase
  • All-time and monthly top tens with podium crowns
  • A transparent benchmark for your ambitions

Practicing alone can feel isolating; seeing other musicians grinding out the same daily work normalizes it. Profiles and the all-time board give you honest benchmarks — and proof that consistency, not talent alone, is what reaches the podium.

User profile with rank, points and earned badges
Monthly leadership board with podium
LCon anima — choose your training

Five ways to sharpen your reading

The exercise hub offers a complete curriculum: structured Learning across all seven clefs, Random mode for honest sight-reading, Piano mode for answering at the instrument, focused Key Signature practice, and Ear Training to recognize every pitch.

  • Learning — 7 clefs taught with the best method
  • Random and Piano modes for real fluency
  • Key signatures and ear training built in

Fluent reading is really five skills in one — recognition, recall, keyboard geography, key awareness and hearing. Training each through its own mode keeps sessions varied and targets your actual weaknesses instead of rehearsing what you already know.

Exercises menu with Learning, Random and Piano modes
Exercises menu with Key Signature and Ear Training
MCrescendo — level by level

Structured levels, flexible settings

Progress from Beginner through Intermediate to Advanced, clef by clef, with completion tracked per exercise. Configure each session to your habits: answer on buttons or a piano keyboard, name notes in English, Latin or German, sound on or off.

  • Three tiers across all seven clefs
  • Button or piano input, three naming systems
  • Completion percentages guide your next step

Nothing kills learning like being overwhelmed. Graded levels serve exactly the next challenge you're ready for, while flexible input and note-naming options mean the exercises adapt to your instrument and tradition — not the other way around.

Reading notes levels with per-clef progress
Exercise setup with input and language options
NCantabile — read and play

Reading exercises that listen

Read real notation on a real staff and answer your way — on note buttons for speed, or at the piano with the microphone listening and judging every note. Time, score and accuracy stay on screen, so every attempt is honest.

  • Crisp notation rendered on a real staff
  • Microphone recognition for piano and voice answers
  • Live time, score and accuracy on every exercise

Reading a note and producing it at the instrument are different skills — the microphone closes that gap. Because the app verifies what you actually play, eye, hand and ear train together, which is how reading fluency transfers to real music.

Reading notes exercise at 100 percent accuracy
Piano exercise answered through the microphone
ODolce — keys and ears

Every key signature, every pitch

Master reading in every major key, organized by sharps and flats with progress tracked per key. Then close the loop with ear training: hear a pitch, name the note — twenty notes per exercise, timed and scored.

  • All major keys from one accidental to seven
  • Independent completion tracking per key
  • Pitch recognition with instant feedback

Real repertoire lives in keys, and hesitation over sharps and flats is what makes sight-reading stall. Working each key deliberately removes that hesitation — while ear training builds the inner hearing that lets you catch your own mistakes.

Key signature selection with sharps and flats
Ear training exercise with play sound button
PRitmico — feel the beat

Rhythm training, eighteen levels deep

Choose a time signature — 4/4, 3/4, 2/4, 6/8 or 3/8 — set your tempo, and climb eighteen graded levels. Inside each exercise you tap the rhythm you read, with every correct beat confirmed as you go.

  • Five time signatures with adjustable tempo
  • 18 graded levels with perfect-score recognition
  • Tap-along exercises with instant feedback

Rhythm mistakes are the most common errors in amateur playing — and the least noticed. Isolating rhythm from pitch and physically tapping each pattern internalizes the pulse, so when you return to your pieces the timing simply feels right.

Rhythm practice with time signatures and levels
Rhythm level exercise with tap feedback
QGrandioso — the full experience

Premium, on your terms

Unlock the complete toolkit — including dedicated bass clef exercises and custom practice timers — with the plan that suits you: monthly, yearly at a meaningful saving, or a single lifetime purchase with no subscription at all.

  • Monthly and yearly plans
  • Lifetime access with a one-time purchase
  • Premium features clearly presented before you commit

Premium keeps the app independent and constantly improving — built by musicians, not an ad machine. The three plans respect different budgets, and the lifetime option means committed players can pay once and simply practice.

Premium plans: monthly, yearly and lifetime
RTutti — bring your friends

Refer friends, earn premium

Music is better in company. Share your personal referral link and when three friends join, you unlock two months of premium access — they get a practice partner, you get the full toolkit.

  • Personal referral link, shared in one tap
  • Two months of premium when three friends join
  • Progress bar shows how close you are

Musicians with practice partners stick with it far longer than those who play alone. Inviting friends gives you built-in accountability and a friendly rival in the leagues — and the premium reward makes the invitation worth sending today.

Refer a friend rewards screen
SAndantino — set the pace

Structured goal setting

Define a precise daily practice target in hours and minutes, and the app projects it into a weekly commitment you can hold yourself to. Configurable reminders arrive at the time you choose, turning good intentions into a sustainable routine.

  • Daily practice target, adjustable to the minute
  • Automatic weekly time projection
  • Scheduled reminders at your preferred hour

A goal you write down gets done; a vague intention doesn't. A realistic daily target protects you from burnout, the weekly projection keeps it honest, and a reminder at your chosen hour beats the most common failure mode of all: simply forgetting.

Practice setup with daily goal and reminders
TSemplice — at a glance

A home screen widget

Your streak, today's minutes and the week's total, visible before you even open the app. Guided setup walks you through adding the widget in four steps — a quiet, constant invitation to sit down and play.

  • Daily streak displayed on your home screen
  • Today's minutes and weekly hours at a glance
  • Guided four-step setup

Habits are triggered by cues, and nothing cues like your own home screen. Seeing the streak you'd lose and the minutes still missing today nudges you to play before the day runs out — no need to even open the app to remember why.

Widget setup guide

Da capo — start today

Let's grow and stay inspired together. Download Go Practice Music and make your next practice session count.

Download on theApp Store Get it onGoogle Play

Free to download · iPhone, iPad & Android

♪ Get the app